The Town of Fuquay-Varina is proposing to widen Sunset Lake Road from US 401 (N. Main Street) to Products Road. The proposed project would include the construction of the following new dedicated lanes:
» A second northbound through lane from US 401 to Products Road
» A northbound right-turn lane from US 401 onto Products Road
» A second southbound through lane from Products Road to south of E. Broad St.
» Extending the dual southbound left-turn lanes from Sunset Lake Road onto US 401 to provide more storage for vehicles
» A southbound right-turn lane into shopping center northContinue reading
The Town of Fuquay-Varina is proposing to widen Sunset Lake Road from US 401 (N. Main Street) to Products Road. The proposed project would include the construction of the following new dedicated lanes:
» A second northbound through lane from US 401 to Products Road
» A northbound right-turn lane from US 401 onto Products Road
» A second southbound through lane from Products Road to south of E. Broad St.
» Extending the dual southbound left-turn lanes from Sunset Lake Road onto US 401 to provide more storage for vehicles
» A southbound right-turn lane into shopping center north of E. Broad St.
Additional improvements include constructing a sidewalk along the east side of Sunset Lake Road for the length of the project, as well as extending sidewalk connections on the west side of Sunset Lake Road to tie into existing infrastructure. Traffic will be maintained in the existing corridor during construction.
The Town has secured approximately $1.3 Million in federal funding for design and construction through the Metropolitan Transportation Planning’s Locally Administered Projects Program. The total project cost is $1.64 Million and the remaining $328,000 will be Town-funded. Construction is anticipated to begin in late 2022.
Please submit comments on the form below through July 29, 2022.
Ampliación de Sunset Lake Road Etapa II - US 401 a Products Road (Proyecto HL-0027)
El Pueblo de Fuquay-Varina propone la ampliación de Sunset Lake Road desde US 401(N. Main Street) hacia Products Road. El proyecto propuesto incluyera la construcción de las siguientes vías reservadas:
» Un segundo carril en dirección norte desde US 401 hasta Products Road
» Carril de giro a la derecha dirección norte desde US 401 a Products Road
» Un segundo carril en dirección al sur desde Products Road al Sur de E. Broad St.
» Extendiendo la doble calzada de carriles dirección sur desde Sunset Lake Road a US 401 para procurar más almacenamiento de vehículos
» Un carril con giro a la izquierda dirección sur al centro comercial norte de E. Broad St.
Mejoras adicionales incluye la construcción de aceras a lo largo del este de Sunset Lake Road por la duración del proyecto y la extensión de las conexiones de la acera hasta el lado oeste de Sunset Lake Road para integrarlos a la infraestructura existente. El tráfico se mantendrá en el corredor existente durante la construcción.
El Pueblo ha asegurado aproximadamente $1.3 millones en fundos federales para el diseño y construcción a través del Programa de Administración Local de Proyectos del Transporte Metropolitana. El costo total del proyecto es $1.64 Millones y el resto de $328,000 será financiado por el Pueblo. La Construction esta anticipada a comenzar a finales del 2022.